| Improvements to FC 14 B,Tack 05 and Rehabilitation of FC 13/D5/LB/MC/ in Usgala Siyambalan |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Improvements of FC 02 (Aluth Ela) at D1 of track 6 in Palukadawala scheme |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Improvements to Embankment Mawela Maha Tank, Deegalla Agrarian Services Division, Kuliyapi |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Improvements of Halgahamula Anicut and Nadungahamula Anicut in Wewagama Agrarian Services |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Improvements to Branch canal 01 from 0+500 to 1+850 of in LB main canal Deduruoya scheme i |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Construction of canal lining from 4+400 to 4+484 in main canal in Gampolawela Raja Ela sch |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Improvements to FC 1 canal from 0+072 to 0+380 in Mahanikakatuwa scheme |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Providing canal lining at 3+700 in Ma ela Main canal |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Improvements from 0+000 to 0+050 in LBMC in Wemedilla scheme |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Improvements to D 39 canal in Stage I Section III in Minipe LB MC,Minipe Division |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Improvements to Dekinda Anicut & Bifurcation stucture at 0+310 in Dekinda main canal |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Procurement of 2nd Hydrogen Generator for Trincomalee |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Construction of 100m long canal lining at 0+010 in Pitamulla canal in Urapola Scheme |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Improvements of 100m long canal linning from 0+550 to 0+650 of C canal in Akuressa Scheme. |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Construction of 100 m long canal lining at 0+160 to 0+260 in Alwathugoda Main canal in Ala |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Construction of 105m long concrete lining (U section ) near Samaradeniya Tank RB main cana |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Improvements of Talalla yaya in Kekanadura Scheme |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Construction of 40m long gabion wall (DS-Right side ) in OR 1 anicut D/S Chainage at 0+150 |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Construction of 50m long retaining wall (Left side)chainage at 0+500Masmulla ara canal in |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Construction Causeway bed at Regulator Structure ofNuwarawewa HLMC Nachchiduwa division |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Refurbishment and Improvements of Regional Offices of Monaragala, Hambanthota, Pottuvil, R |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Conducting a LiDAR Survey and Preparation of a LiDAR DTM for Flood Vulnerable River Basins |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Carrying out cross sectional Survey for 22 River basins in Sri Lanka |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Consultancy Services for Conducting a Social Impact Assessment (SIA) and Preparation of a |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Hiring an Individual Consultant as a Geotechnical Engineering Expert for the Dam Safety Re |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Hiring an Individual Consultant as Structural Engineer/Dam Design Expert for the Dam Safet |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Hiring an Individual Consultant as an Electro-Mechanical and Instruments Expert for the Da |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Hiring an Individual Consultant as a Hydrology, Hydraulics and Reservoir Operation Expert |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Hiring an Individual Consultant as a Hydraulics Engineer for the Dam Safety Review Panel u |
Sri Lanka |
WB |
2026-06-27 |
TBD |
| Development of Real-Time Flood Forecasting Models for 22 River Basins in Sri Lanka |
Sri Lanka |
WB |
2026-06-27 |
TBD |